• Wet Type Cement Production Line
  • Wet Type Cement Production Line

Wet Type Cement Production Line

Application: Construction, Mineral Operation
Certification: ISO
Customized: Customized
Automatic Grade: Semiautomatic
Capacity: 2-4000tpd
Model: Verious
Customization:
Diamond Member Since 2011

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
various
Certificate
ISO9001, ISO14000,CE
Installation
Under Our Engineer′s Guide
After Sale Service
for The Whole Using Life
Design
by Professional Engineer
Select Model
Supply
Factory Established
1956
Mining Object
Cement Equipment
Technical Parameters
See Technical Table
Transport Package
Packaging in Standard Containers
Specification
ISO9001, ISO14000, CE
Trademark
ZK
Origin
Zhengzhou, China Mainland
HS Code
8417
Production Capacity
2-4000t/D

Product Description

We Zk corporation have a large capacity in cement production line, which capacity is from 300tpd to 1500tpd, and 1500tpd cement production line can produce 1500tpd clinker, the national large-size enterprise and national market leader enterprise of Chinese building material industry, is an export base of cement equipments.We henan zhengzhou mining machinery Co., Ltd, can offer 150tpd-8000tpd clinker cement production line.And all of our products have passed by ISO9001:14000.Clinker cement production line mainly has lifting equipment, drying equipment, grinding equipment, transmission equipment, dust removal equipment, and packaging equipment, etc.According to different plant design production planning, a variety of equipment also need to customize.Our company has a long-term production equipment design, manufacturing and installation experience.We have extensive experience for producing 1600 tons / day cement production line project.We can provide the appropriate technical support to all the clients, including select equipment model.

Wet Type Cement Production Line

Process of cement production line:
1.Raw Materials
The main raw materials used in the cement manufacturing process are limestone, sand, shale, clay, and iron ore.The main material, limestone, is usually mined on site while the other minor materials may be mined either on site or in nearby quarries.Another source of raw materials is industrial by-products.The use of by-product materials to replace natural raw materials is a key element in achieving sustainable development.

2.Raw Material Preparation
Mining of limestone requires the use of drilling and blasting techniques.The blasting techniques use the latest technology to insure vibration, dust, and noise emissions are kept at a minimum.Blasting produces materials in a wide range of sizes from approximately 1.5 meters in diameter to small particles less than a few millimeters in diameter.

Material is loaded at the blasting face into trucks for transportation to the crushing plant.Through a series of crushers and screens, the limestone is reduced to a size less than 100 mm and stored until required.
Depending on size, the minor materials (sand, shale, clay, and iron ore) may or may not be crushed before being stored in separate areas until required.

3.Crushing and Pre-homogenization
Crushing.During producing Concrete, most of the raw materials must be first crushed before being used to make concrete.Among these raw materials which include lime stone, clay, iron ore and coal, etc.The lime stone is of the greatest usage to make concrete.With comparatively larger particles and higher hardness, crushing the lime stone to required fineness after mining is of relatively important consequence among crushing all those raw materials.

There are many crushers used in crushing these raw materials, such as jaw crusher, impact crusher, cone crusher and vertical shaft impact crusher, etc.According to the raw materials' different particles and hardness, there are several suitable crushers which can be used in the crushing.
Pre-homogenization of raw materials.

4.Raw material Homogenization
In the process of new dry concrete production, the stability of pit entry clinker raw material component is the premise of the whole system.Raw material homogenization system plays very important role in the stability of pit entry clinker raw material component.

5.Pre-heater and calciner

6.The burning of concrete clinker

7.Grinding
Grinding is the last process of cement produce and also is the most current consuming working procedure.Cement clinker get grinded into the right size.The smaller the particle size is, the better the final cement is.It's important to choose suitable grinding machine.

8.Concrete Packaging

Company Name:Henan Zhengzhou Mining Machinery Co., Ltd.
Official Website:http://hnzkjq.en.made-in-china.com/ & http://hnzkjq.en.made-in-china.com/
24-hour Free Sales Consulting Phone :861-0371 -5590 2866 .
model drum size S peed bell weight feed size output size C apacity P ower
( m ) ( r/min ) ( t ) ( mm ) ( mm ) ( t/h ) ( kw )
MQZ122 4 1.2X2.4 31 4.8 0-20 0.07-0.6 0.4-6.8 37
MQZ1645 1.6X4.5 27.5 14 0-25 0.07-0.4 424 95
MQZ2745 2.7X4.5 21.9 43 0-25 0.07-0.4 13-150 320
MQZ3645 3.6X4.5 17.8 90 0-25 0.07-0.4     120-220 1000
MQZ3660 3.6X6.0 17.8 120 0-25 0.07-0.4 50-230 1250

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now