• Supply Full Set of Ore Dressing Line Equipment
  • Supply Full Set of Ore Dressing Line Equipment
  • Supply Full Set of Ore Dressing Line Equipment
  • Supply Full Set of Ore Dressing Line Equipment
  • Supply Full Set of Ore Dressing Line Equipment
  • Supply Full Set of Ore Dressing Line Equipment

Supply Full Set of Ore Dressing Line Equipment

Type: Flotation Separator
Voltage: 380V
Weight: <1T
Material: Stainless Steel
Material Feature: Fire Resistant
Certification: ISO9001:2008, ISO9001:2000, CE
Customization:
Diamond Member Since 2011

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
reference to the form
Energy Saving
Energy Saving
Warranty
1 Year
Color
Multi Color
Customized
Customized
Condition
New
Application
Ore Dressing
Capacity
Customized
Certificate
ISO9001, ISO14000, CE
After Sale Service
We Offer
Factory Area
55000m2
Experience
More Than 50 Years
Design
by Professional Engineer
Installation
Under Our Engineer′s Guide
Spare Parts
We Offer
Transport Package
Standard Export Packing
Specification
ISO9001, ISO14000, CE
Trademark
ZK
Origin
Zhengzhou, China
HS Code
8417
Production Capacity
Customized

Product Description

Supply Full Set of Ore Dressing Line Equipment
Beneficiation Plant

ZK CORP owns strong ability to offer solution for beneficiation plant and supply benefication equipments. The minerals we can process contain gold, silver, copper, lead & zinc, iron, tungsten, tin, etc.

Beneficiation Method:
Accoridng to different mineral characteristics, different beneficiation method is used. There are magnetic beneficiation, flotation beneficiation and gravity beneficiation. Some minerals have many elements suitable for beneficiation, so 2 type beneficiation method will be used in one plant for different elements.


Supply Full Set of Ore Dressing Line Equipment


Beneficiation Plant Description
Beneficiation plant contian crushing system, grinding system, separation system.
A. Crushing System
Introduction:
Minerals are explored from mountain and will firstly need to be crushed and get suitable size for next stage grinding system. Stone size will be changed from 500mm to 25mm.
Equipments:
Feeder-Jaw Crusher-Cone Crusher (or Impact crusher or Fine Jaw crusher) -Screen-Belt Conveyor.
Process:
Front loader feed mineral ore into hopper and stones will be feed into jaw crusher by feeder. Then material comes to secondary crusher. After crushing, material goes to screen. Material≤ 25mm goes to ball mill. >25mm goes back to secondary crusher to crush again. It forms closed circuit crushing system.

B. Grinding Sytem
Introduction:
After crushing, minerals need to be grinded into micro particle at about 200 mesh to prepare for element separation. Stone size will be changed from 25mm to 200mesh.
Equipments:
Ball mill-Classifier(or hydrocyclone)
Process:
Material after crushing will be conveyed to ball mill by belt conveyor or bucket elevator. In ball mill, material will be grinded and discharged to classifier for grading. Suitable material will go to next stage, big material will go back to ball mill to grind again. It forms a closed circuit grinding system.

C. Separation System
Introduction:
Element separation have 3 method: Magnetic beneficiation, Flotation beneficiation and Gravity beneficiation. Different mineral type will use different beneficiation method accroding to minerial's characteristics.
Magnetic beneficiation is suitable for iron ore. Flotation beneficiation is suitable for gold, silver, copper. Gravity is suitalbe for gold, tungsten, tin, etc.


Equipments:
Magnetic beneficiation. Main equipments contain magnetic separator.
Flotation beneficiation. Main equipments contains flotation, mixing tank, concentrator.
Gravity beneficiation: Sprial chute, shaking table, jigger. Process:
After grinding, suitable material size for beneficiation is achieved. For iron, material will goes to magnetic separator. For gold and copper, material will go to flotation.
For some plant, 2 beneficiation method are all used. After magnetic or flotation separation, mateiral will go to sprial chute and shaking table to separate different elements.


Company Name: Henan Zhengzhou Mining Machinery Co., Ltd.
Official Website: http://hnzkjq.en.made-in-china.com/ & http://hnzkjq.en.made-in-china.com/
24-hour Free Sales Consulting Phone: 861-0371 -5590 2866.
Company Address: Qiaolou caizhai industrial estate, Xingyang city, Henan Province
Please pay attention to the company's other products:
Price of rotary kiln: http://hnzkjq.en.made-in-china.com
Rotary Kiln: http://hnzkjq.en.made-in-china.com
Preheater: http://hnzkjq.en.made-in-china.com
Cement Mill: http://hnzkjq.en.made-in-china.com
Rotary Dryer: http://hnzkjq.en.made-in-china.com
Raw Mill: http://hnzkjq.en.made-in-china.com
Ball Mill: http://hnzkjq.en.made-in-china.com
spec technical parametere speed reducer motor supporting quantity
(m) rev slope output type type power
  (r/min) (%) (t/h) (KW)
Φ1.6x32 0.58~2.85 4 2 ZQ75-50 YCT250-4A 18.5 3
Φ1.6/1.9x36 0.53~1.59 4 2.5~3 ZQ110-7 YCT250-4B 22 3
Φ1.9x39 0.53~1.59 4 3~3.4 ZQ125-7 YCT315-4A 37 3
Φ2.2x45 0.214~1.64 3.5 4~5 main:ZS125-5 YCT315-4B 45 3
auxiliary:ZQ40-40 Y112M-4 4
Φ2.5x50 0.62~1.5 3.5 5~6 main:ZS165-5 YCT355-4A 55 3
auxiliary:ZS50-1 Y160M-6 7.5
Φ2.5x55 0.62~1.5 3.5 5~6 main:ZS165-5 YCT355-4A 55 3
auxiliary:ZS50-1 Y160M-6 7.5
Φ2.8x55 0.62~1.5 3.5 6~7 main:ZS165-6 YCT355-4B 75 3
auxiliary:ZS50-1 Y160L-6 11
Φ3.0x60 0.5~1.5 3.5 7~9 main:ZS165-3 ZSN-280-11B 125 4
auxiliary:ZS50-1 Y160L-6 11
Φ3.2x64 0.4~1.5 3.5 8~10 main:ZL130-16 ZSN-280-11B 190 4
auxiliary:ZL50-10 Y180L-4 22
Φ3.5x70 0.4~1.5 3.5 12~14 main:ZSY500-40 ZSN-315-082 280 4
auxiliary:ZL50-14 Y180L-4 22
Φ4x80 0.4~1.5 3.5 16~20 main:ZSY630-35.5 ZSN-315-12 355 4
auxiliary:ZSY280-35.5 Y200L-4 30
 



Our service: Training & Service

Pre-sale services: enthusiasm
We provide you with the prophase plan, process flow design and manufacturer equipment, according to your special demand.
Sale services: servant
Send technicians to the jobsite for guiding the installation and adjustment, training operators and finishing the check and accept together with you.


After-sale services: faithfulness
To establish long term friendship, we will regularly pay return visit to customers.
In addition, we provide one-year warrantee to make sure your machine runs consistently. We always keep certain inventory level of spare parts, which means the replacements can be shipped to you right away.
Welcome to visit our company and workshop, we sincerely look forward to cooperating with you. We will provide you with the most suitable products with the reasonable price.



Packaging & Shipping

Packing:
1.Sand blasting, coat with high quality paint.
2.Rustproof and moisture proof before delivery. 
3.Load container, Spear Parts in wooden case or iron sheet trunk.


Shipping:
1.By sea or by train. we have 20 years cooperate transport company. best freight, fast delivery.
2.Send B/L in 3-5 days after ship leaving.
3.We will remind you before ship arrival.


Supply Full Set of Ore Dressing Line Equipment
Supply Full Set of Ore Dressing Line Equipment
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now