• Hot Sale Grinding Equipment for Cement
  • Hot Sale Grinding Equipment for Cement
  • Hot Sale Grinding Equipment for Cement
  • Hot Sale Grinding Equipment for Cement
  • Hot Sale Grinding Equipment for Cement
  • Hot Sale Grinding Equipment for Cement

Hot Sale Grinding Equipment for Cement

Application: Construction
Certification: CE, ISO
Customized: Customized
Automatic Grade: Automatic
Installation: Under Our Engineer′s Guide
Certificate: ISO900,ISO14000,CE
Customization:
Diamond Member Since 2011

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
Various Model
Output
100-1500tpd
Experiences
50 Years
Condition
New
After Sale Service
for The Whole Using Life
Spare Parts
We Offer
Testing
We Offer
Type
Cement Clinker Grinding Station
Training
on Site
Transport Package
Standard Export Packing
Specification
various
Trademark
ZK
Origin
China
HS Code
8417
Production Capacity
60 Per Month

Product Description

Hot sale grinding equipment for cement
Product Description:
Cement grinding plant is very important for grinding after the crushing process,which is widely used in the manufacture industries, such as cement, silicate, new building material, refractory material, fertilizer, ferrous metal, nonferrous metal.We can supply any type of ball mill.If you are interested in our ball mill,coal ball mill,and cement ball mill.Contact us.

Ball mill,coal ball mill,and cement ball mill are mainly export to Canada, the United States, Mexico and so on.Not only selling well in Chile, Argentina, Uruguay,but also popular in Colombia,Venezuela, Guyana etc.
Hot Sale Grinding Equipment for Cement

Complte steps of cement plant process: 
Step 1:Raw materials Preparation--Limestone crushing

a.Process introduction: Limestone is the main raw material in cement production , and most factories are located near the limestone by blasting or use the loader to the mining of raw materials limestone , transported to the crusher into fragments .
b.The main raw material:limestone,clay,iron ore
 
Step 2:Raw material grinding --Limestone , clay , iron and other raw materials
a.Process introduction: the use of ball mill or vertical mill raw material is ground to a powder, and then by conveyor transport to preblending yard for storage and further material mixed
b.The main raw material:

Step 3:Cement grinding--Clinker , gypsum,mix materials and so on
 a.Process introduction: Clinker , gypsum, mixed materials in a ball mill , cement grinding into a qualified drug cement. The use of the powder selecting machine can conveniently adjust cement drug, to achieve energy saving production
b.Main Products:Ball mill, Powder selecting machine ,Bucket elevator, Air chute ,FU chain conveyor, Dust collector etc.

ste p5:Cement storage,packaging--Finished cement belt/bulk delivery
a. Process introduction: The use of packaging machines and automatic loading machine can achieve the shipment of bagged cement factory, use bulk cement equipment can realize bulk cement canning factory
b.Equipment:Conveying equipment, Dust collecting equipment,Belt conveyor,Elevator Air chute,Spiral screwetc.

Hot Sale Grinding Equipment for Cement
 

Cement storage and Cement packing:

Three round silos will be used for cement storageFeeding cement from cement silo to packing machine, cement packer will be used for cement packing. Cement will be fed into vibration sieve by elevator, then into cement hooper, and then into cement packerBagged cement will be sent into loading machine by belt conveyor.
The weight of each bag will be measured and adjusted by electron balance when packing.

Packing system sets has the complete soot eliminating devices to ensure the exhaust standard.

Cement Grinding's working principle:
The cement grinding  has horizontal cylindric rotating device, outer rotating with gear, two warehouses, is lattice-type ball mill. Material from the feeder device throuth hollow shaft of feeder evenly into the first warehouse of cement grinding , there are ladder liner and ripple liner in the warehouse , built by steel ball with different specifications , rotating cylinder produces centrifugal force take the ball to a certain height then fall,have a impact of the thumping and grinding for the material. After the material in the first warehouse reach coarse grinding,pass throuth single-wall partition into the second position, the warehouse lined with flat lining and steel balls in it ,have further grinding for the material . Powder discharged through the discharging plate to complete the grinding operation.

 

No.

Item

Unit

Closed circuit production

1

Factory capacity

×10³t/a

100

160

250

350

500

2

Main material usage

 

 

 

 

 

 

 

Clinker

t/a

80000

128000

200000

280000

400000

 

Gypsum

t/a

5000

8000

12500

17500

25000

 

Pozzolana

t/a

15000

24000

37500

52500

75000

3

Energy consumption

 

 

 

 

 

 

 

Fresh water

t/a

4000

7000

9000

12000

17000

 

Electrical

kWh/a

3600000

5700000

8500000

1200000

1.7E+07

4

Layout transportation

 

 

 

 

 

 

 

Land area

 

15000

18000

20000

22000

24000

5

Project invest

 

 

 

 

 

 

 

Production line total invest

Ten    

600

1000

1500

2000

2850

 

 

thousand

 

 

 

 

 

6

Workers

 

30

35

35

35

35

7

Main equipment

 

 

 

 

 

 

 

Ball mill

 

Φ2.2×6.5m

Φ2.4×11m

Φ3×11m

Φ3.2×13m

Φ3.5×13m

 

 

 

14t/h

24t/h

35t/h

50t/h

70t/h

 

 

 

380kW

630kW

1250kW

1600kW

2000kW

 

Belt conveyor

 

B500

B650

B650

B800

B1000

 

Mill outlet bucket elevator

 

TH315

TH400

NE100

NE150

NE200

 

Air classifier

 

NHX400

NHX600

NHX700

NHX800

NHX1000

 

 

 

(Osepa   N250)

(Osepa   N500)

(Osepa   N750)

(Osepa   N1000)

(Osepa   N1500)

 

Bag filter

 

PPC32-4

PPC32-6

PPC64-5

PPC64-6

PPC64-7

 

 

 

(PPC64-6)

(PPC96-7)

(PPC96-2×5)

(PPC96-2×6)

(PPC96-2×10)

 

Finished production bucket elevator

 

TH250

TH315

NE50

NE100

NE100

 

Screw conveyor

 

LS400

LS400

LS500

-

-

 

Packer

 

Three   nozzle

Four   nozzle

Six   nozzle

Eight       nozzle

Eight   nozzle

 

Belt weigher

 

B500×2000

B650×2500

B800×2500

B800×2500

B1000×3500

Company information:
Henan Zhengzhou Mining Machinery Co., Ltd is located in Wulong Industrial Park of Zhengzhou Xingyang which is the capital of Henan Province. It is at the junction of 310 State Road and Xingmi Road, close to the highway, railway station, West Zhongyuan Road, downtown area of Zhengzhou and Zhengzhou International Airport. The transportation condition is very convenient. The main products of company include: ball mill, rotary kiln, vertical preheater, cooler, crusher, metallurgical coke oven, magnetic separator, flotation machine, classifier, feeder, bucket elevator, preheater, dust collector, elevator, drier, and other equipments relate to metallurgy, cement, lime, mineral processing, refractory, chemical industry. The products of Henan Zhengzhou Mining Machinery Co., Ltd have been sold to every province of China and exported to Russia, Korea, Vietnam, Malaysia, Nepal, Bangladesh, Mexico, Armenia, Africa, South America and other countries and regions.

Hot Sale Grinding Equipment for Cement
Company Name: Henan Zhengzhou Mining Machinery Co., Ltd.
Official Website: http://hnzkjq.en.made-in-china.com
24-hour Free Sales Consulting Phone: +86-18937185591.
Company Address: Qiaolou caizhai industrial estate, Xingyang city, Henan Province
Please pay attention to the company's other products:
Price of rotary kiln: http://hnzkjq.en.made-in-china.com/calcining.html
Rotary Kiln:http://hnzkjq.en.made-in-china.com/calcining.html
Preheater: http://hnzkjq.en.made-in-china.com/calcining/8.html
Cement Mill: http://hnzkjq.en.made-in-china.com/grinding/17.html
Rotary Dryer: http://hnzkjq.en.made-in-china.com/calcining/116.html
Raw Mill: http://hnzkjq.en.made-in-china.com/grinding/16.html
Trommel Screen:http://hnzkjq.en.made-in-china.com/separating/137.html
Rotary cooler:http://hnzkjq.en.made-in-china.com/calcining/6.html


FAQ:

1. What's the biggest cement plant you can suppy?

     3000TPD

2. What's the technology you adopt for the cement plant?

     Dry Style with Preheater Technology

3. How many people needed to operate a cement plant?

     It's about 100-120 persons 

Welcome to visit our company and workshop, we sincerely look forward to cooperating with  you. We will provide you with the most suitable products with the reasonable price.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now