Customization: | Available |
---|---|
Type: | Beneficiation Machinery |
Voltage: | 380V |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
We have rich project cases on different production process of ore dressing plant, Gold Ore Flotation Process, Gold Mine CIP Process Technology, Gold Ore Heap Leaching Process, Iron Ore Beneficiation Process, Fluorite Mineral Processing Technology, Lead-zinc Ore Dressing Process.
Raw material ores is exploited from mountain are big size,so it is necessary to crush firstly,in this process,the raw materials will be feed into primary crusher by feeder,then come into secondary crusher.The materials will go into screen after first and secondary crusher, the suitable size material (≤25mm) will go to next step. Oversize(>25mm) material will go back to secondary crusher to crush again. This forms a closed crush circuit.
In this process, material will be grinded into suitable sizes (about 200 mesh) for beneficiation.After grinding material will come to classifier. In classifier, suitable size material will go to next step. Coarse material will go back to ball mill for grind again. This process is a closed grind circuit.
In this process, materials will be separated by flotation, magnetic separator or gravity concentrating machine. We will get the materials that we need.
Process introduction: After beneficiation, there are some residual water in ore concentration. So we have to carry on concentrate dehydration to meet the requirements of transportation and smelting.
50TP Ore Dressing Line Equipment List for your Reference
Equipment |
Size |
QTY (set) |
Power (kW) |
Remarks |
Chute feeder |
980×1240 |
1 |
7.5 |
|
Jaw crusher |
PE400×600 |
1 |
30 |
Cast steel rack |
Jaw crusher |
PEX250×1000 |
2 |
37 |
Cast steel rack |
Swaying feeder |
600×600 |
1 |
2.2 |
|
Rotary ball mill |
GM2.1×4.0 |
1 |
245 |
|
Spiral classifier |
FLG-2000 |
1 |
18.5 |
|
Magnetic separator |
CTB900×1800 |
1 |
4 |
2500gs |
Magnetic separator |
CTB750×1800 |
2 |
3 |
1400~180gs |
100 TPD Ore Dressing Line Equipment List for your Reference
Equipment |
Size |
QTY (set) |
Power (kW) |
Remarks |
Chute feeder |
980×1240 |
1 |
7.5 |
|
Jaw crusher |
PE600×900 |
1 |
75 |
Cast steel rack |
Fine jaw crusher |
PEX250×1200 |
2 |
37 |
Cast steel rack |
Vibrating feeder |
DZ-5 |
2 |
0.75×2/set |
|
Ball mill |
GM2.7×3.6 |
1 |
475 |
|
Spiral classifier |
FLG-3000 |
1 |
30 |
|
Magnetic separator |
CTB-1024 |
1 |
5.5 |
2500gs |
Magnetic separator |
CTB-1021 |
2 |
4/set |
1400~1800gs |