700tons Per Day Clinker Cement Manufacturing Plant

Product Details
Customization: Available
After-sales Service: Provide a Full Set of After-Sales Service.
Warranty: 1 Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2011

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Years of Export Experience
The export experience of the supplier is more than 10 years
Management Certification
The supplier has quality management system certification, including:
ISO45001:2018 certificate
ISO9001:2015 certificate
ISO14001
Product Certification
The supplier's products already have relevant certification qualifications, including:
CE
to see all verified strength labels (31)
  • 700tons Per Day Clinker Cement Manufacturing Plant
  • 700tons Per Day Clinker Cement Manufacturing Plant
  • 700tons Per Day Clinker Cement Manufacturing Plant
  • 700tons Per Day Clinker Cement Manufacturing Plant
  • 700tons Per Day Clinker Cement Manufacturing Plant
  • 700tons Per Day Clinker Cement Manufacturing Plant
Find Similar Products
  • Overview
  • Product Description
Overview

Basic Info.

Model NO.
Various Model
Application
Construction, Mineral Operation
Certification
ISO
Customized
Customized
Automatic Grade
Automatic
Installation
Under Our Engineer's Guide
Training
on Site
Certificate
ISO9001, ISO14000, CE
Model Selected
We Offer
Color
Customized
Working Hours
Continuous
After Sale Service
for The Whole Using Life
Testing
We Offer
Design
by Our Professional Engineer
Name
China Cement Plant Making Equipment
Transport Package
Exported Standard Package
Specification
ISO9001, ISO14000, CE
Trademark
ZK
Origin
Zhengzhou, China
HS Code
8417
Production Capacity
150-3000tpd(China Cement Plant Making Equipment)

Product Description

700tons per day Clinker Cement Manufacturing Plant

Product Description

 

Cement grinding plant introduction

Cement grinding station, or called cement grinding plant, is an individual cement grinding unit formed independently from the final product stage of cement production. Cement Grinding Station processing stage will add the cement clinker into the appropriate amount of mixed materials for grinding, to produce the finished cement. 

The new-type cement grinding units adopt pre-grinding technology. The cement grinding units not only reduce the particles of feeding materials, but also help to produce cracks and flaws inside the particles, which largely increase production capacity of cement mill, reduce the energy consumption.

Henan Zhengzhou Mining Machinery Co., Ltd. was founded in 1956, has rich experience in cement plant and cement grinding plant construction, who can provide customers with the whole plant design, equipment supply, installation and commissioning supervision, etc one-stop services. If you want to know more information about the differences between cement grinding plant and full cement plant, you can contact with us directly. 

700tons Per Day Clinker Cement Manufacturing Plant

Advantages

1. High grinding efficiency

For the structure, of the cement mill, weadopts the advanced obstructing equipment for internal powder, add theactivated device to the fine grinding chamber, and there is the special grateplate at the end of the cement mill, which can reduce the size of the grindingmedium, greatly improve the grinding efficiency, and achieve the purpose ofhigh output and low energy consumption.

2. Energy saving and environmental protection

The cement grinding unit has advantages of simple structure,strong controllability, and easy to operate or maintain. The dischargeconcentration is less than 50mg/Nm3, lower than the discharge standard, andprotect the environment of the production site effectively.

3. Good quality of finished products

The production process overcomes the disadvantages of traditionalequipment. The fineness of product is easy to be adjusted, apply for differentrequirement of fineness. The equipment also has advantages of large heatdissipation area and low temperature inside mill. The finished product ofnew-type cement grinding unit has high quality and large capacity.

4. High output, large handling capacity

Compared to other production process, with samefeeding size and other working conditions, our cement grinding unit canincrease capacity by 30%, and the energy consumption can be reduced by 15%.
700tons Per Day Clinker Cement Manufacturing Plant

Technology

1. Batching: The shipping clinker is discharged into the dock crane and then transported to the clinker warehouse. After unloading at the bottom of the tent warehouse, it is transported to the clinker batching warehouse. Gypsum and slag are transferred from the loader to the crusher for crushing and then hoisted into gypsum and slag storehouse respectively.

2. Weighing, mixing and feeding cake: After battering the bottom of the warehouse, it will be sent to the stable flow weighing bin of the cement mill by the belt conveyor, and an iron remover will be arranged on the conveyor. The materials are mixed and stabilized in the steady flow weighing bin, and then fed into the cement roller press uniformly and continuously in the form of a material column. After the material passes through the high pressure, the physical structure is destroyed, forms the material cake and it will be raised by the hoist feeding classifier.

3. Grading: The classifier breaks the cake and grades it, and then separates the fine powder less than 6mm from the coarse powder more than 6mm. The coarse powder is returned to the stable flow weighing bin of the cement roller press, and then extricated again, and the fine powder is fed into the cement mill. After the fly ash is measured by the reamer scale, it goes through the chute into the hoist and feeds directly into the cement mill through the chute and the feeding chute.

4. Grinding: after cement mill grinding, materials enter into the powder separator, the fine powder is sent to the cement silo by the air transmission chute and the elevator, the coarse powder back to the cement mill to continue grinding. One part of the outgoing cement is controlled by the bottom unloader of the fluidized warehouse, and then through the air conveying chute and the elevator, sent to the packaging machine room for delivery, while the other part is sent to the bulk carrier for delivery by the air conveying chute.
700tons Per Day Clinker Cement Manufacturing Plant
 
No. Item Unit Closed circuit production
1 Factory capacity ×10³t/a 100 160 250 350 500
2 Main material usage            
  Clinker t/a 80000 128000 200000 280000 400000
  Gypsum t/a 5000 8000 12500 17500 25000
  Pozzolana t/a 15000 24000 37500 52500 75000
3 Energy consumption            
  Fresh water t/a 4000 7000 9000 12000 17000
  Electrical kWh/a 3600000 5700000 8500000 1200000 1.7E+07
4 Layout transportation            
  Land area   15000 18000 20000 22000 24000
5 Project invest            
  Production line total invest Ten     600 1000 1500 2000 2850
    thousand          
6 Workers   30 35 35 35 35
7 Main equipment            
  Ball mill   Φ2.2×6.5m Φ2.4×11m Φ3×11m Φ3.2×13m Φ3.5×13m
      14t/h 24t/h 35t/h 50t/h 70t/h
      380kW 630kW 1250kW 1600kW 2000kW
  Belt conveyor   B500 B650 B650 B800 B1000
  Mill outlet bucket elevator   TH315 TH400 NE100 NE150 NE200
  Air classifier   NHX400 NHX600 NHX700 NHX800 NHX1000
      (Osepa   N250) (Osepa   N500) (Osepa   N750) (Osepa   N1000) (Osepa   N1500)
  Bag filter   PPC32-4 PPC32-6 PPC64-5 PPC64-6 PPC64-7
      (PPC64-6) (PPC96-7) (PPC96-2×5) (PPC96-2×6) (PPC96-2×10)
  Finished production bucket elevator   TH250 TH315 NE50 NE100 NE100
  Screw conveyor   LS400 LS400 LS500 - -
  Packer   Three   nozzle Four   nozzle Six   nozzle Eight       nozzle Eight   nozzle
  Belt weigher   B500×2000 B650×2500 B800×2500 B800×2500 B1000×3500




 
FAQ:

Q: Can I visit your factory?
A: Yes. Many domestic and international customers visit our factory every year.
 
Q: How long is the warranty of your equipment? Do you supply spare parts?
A: Our warranty period is one year generally. We can supply spare parts.
 
Q: Do you provide after-sale service?
A: Yes. We have a professional after sale service team to promptly and thoroughly solve your problems.
 
Q: Do you provide equipment operation training?
A: Yes. We can send professional engineers to the working site for equipment installation, adjustment, and operation training. All of our engineers have passports.
 
Q: Do you provide mineral processing flow chart?
A: Yes. Our experienced engineers are specialized in designing process flow for various ores beneficiation, including iron ore, tin ore, copper ore, gold ore, lead zinc ore, manganese ore, etc.
 
Q: Can you test our samples?
A: Yes. You can send your samples to us for test and analysis.
 
Q: Have you made the whole ore dressing lines?
A: Yes. We have made several large ore dressing lines at home and abroad.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Send Inquiry
Chat Now