Small scale cement clinker grinding plant and packaging unit in cement factory
We Henan Zhengzhou Mining Machinery Co., Ltd, can offer 150TPD-8000TPD clinker cement production line.And all of our products have passed by ISO9001:14000.
Clinker cement production line mainly has lifting equipment, drying equipment, grinding equipment, transmission equipment, dust removal equipment, and packaging equipment, etc.According to different plant design production planning, a variety of equipment also need to customize.
Our company has a long-term production equipment design, manufacturing and installation experience.We have extensive experience for producing 1600 tons / day cement production line project.We can provide the appropriate technical support to all the clients, including select equipment model.
It has the advantages as followings:
1) Low energy consumptionan and high efficiency
2) Little pollution
3) Long life using
4) High output, Low Power Consumption
In cement plant, rotary kiln, ball mill is the indispensable equipment.Rotary kiln production and ball mill producted by Henan Zhengzhou Mining Machinery Co., Ltd.Can improve the efficiency of the cement production, saving energy, let you get more economic interests.Welcome general customers order.Production capacity:
Cement production technology and equipment is the advantage of my plants, my plant the production of cement rotary kiln, cement mill can be used in the 100 tons to 6000 tons of cement plant.
Complte steps of cement process:
Step1:Raw materials Preparation--Limestone crushing
A.Process introduction:Limestone is the main raw material in cement production, and most factories are located near the limestone by blasting or use the loader to the mining of raw materials limestone, transported to the crusher into fragments.B.The main raw material:Limestone, clay, iron ore
Step 2:Raw material grinding --Limestone, clay, iron and other raw materials
Process introduction:The use of ball mill or vertical mill raw material is ground to a powder, and then by conveyor transport to preblending yard for storage and further material mixed.
Step 3:Calcining clinker--raw material powder after homogenization
A.Process introduction:The homogenized material enters the preheating decomposition system, decomposition rate of 95%, into the rotary kiln, clinker.
B.List of equipment and processes:Preheater, Decomposition furnace, Rotary kiln, Ball mill, Cooler, Clinker conveyor belt, Belt conveyor, Dust collecting equipment etc.
Step 4:Cement grinding--Clinker, gypsum, mix materials and so on
A.Process introduction:Clinker, gypsum, mixed materials in a ball mill, cement grinding into a qualified drug cement.The use of the powder selecting machine can conveniently adjust cement drug, to achieve energy saving production
B.Main Products:Ball mill, Powder selecting machine, Bucket elevator, Air chute, FU chain conveyor, Dust collector etc.
Step5:Cement storage, packaging--Finished cement belt/bulk delivery
A.Process introduction:The use of packaging machines and automatic loading machine can achieve the shipment of bagged cement factory, use bulk cement equipment can realize bulk cement canning factory
B.Equipment:Conveying equipment, Dust collecting equipment, Belt conveyor, Elevator Air chute, Spiral screwetc.
type(mm) |
indiclination(%) |
rotation speed(r/min) |
input tempreture(ºC) |
motor power(kw) |
outpur(t/h) |
weight(t) |
GZΦ800×8000 |
5 |
7.5 |
≤700 |
4-6 |
0.8-2.0 |
3.5 |
GZΦ1000×10000 |
5 |
6.19 |
≤700 |
5.5-7.5 |
1.0-3.5 |
5.6 |
GZΦ1200×10000 |
5 |
5.3 |
≤700 |
11-13 |
1.8-5 |
14.04 |
GZΦ1500×12000 |
5 |
4.5 |
≤800 |
13-15 |
3.3-7.5 |
17.76 |
GZΦ1800×14000 |
5 |
3.3 |
≤800 |
18.5 |
5-9 |
29 |
GZΦ2200×120000 |
5 |
3 |
≤700 |
22 |
6-12 |
33 |
GZΦ2400×18000 |
5 |
2.5 |
≤800 |
30 |
10-15 |
53.3 |