Customization: | Available |
---|---|
Application: | Construction |
Certification: | CE, ISO |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Mini 50TPD Cement Grinding Plant
Generally, cement clinker production line is established nearby the raw material site, and the cement grinding station is set up near the big - medium city where the main sale market of the cement is, thus will reduce the delivery fee, if the clinker production station also set up in the city, because one tons clinker need to consume 1.6 tons raw material, which will add 60% raw material delivery cost. Otherwise, if the clinker production line stay together with the clinker grinding station in the raw material site, because the mixed material most are the city slag, these mixed slag will delivered to the raw material site, and final cement will also be delivered to the city, so add much more delivery cost,
So in recent years, Most cement clinker grinding stations are established nearby the city, Cement grinding station is a green-effective industry.
Brief introduction of cement grinding station process flow:
After crushed by hammer crusher, the large materials become small ones and are sent to storage hopper by elevator, edge of then evenly sent to the upper distribution plate of the turnplate by vibrating feeder and sloping feeding pipe. When the grinding mill is at work, all the grinding rollers are rolling in the ring, and the materials are driven to the edge of the turnplate by the centrifugal force and fall down into the grinding chambers where the materials are repeatedly pressed, crushed and grinded by the rollers.
The high-pressure air blower constantly inhales air within the grinding mill and, in turn, the air flow with crushed materials are brought to the classifier whose high-speed impeller will screen the airflow: the unqualified particle size will fall and return to the mill for being reground while the qualified particle size mixed with air will go into the cyclone powder collector. Most of the qualified powders will fall an exit from the discharging valve at the bottom; a small proportion of the fine powders, with airflow, moves to the dust cleaner, and clings to the surface of the filter bags.
At the same time, the fine powders clinging to the surface fall down by the sudden vibration of the filter bags, which is caused by the instantly ejected high-pressure gas controlled by the pulse valve.The materials from the above two lots are sent by the conveyor at the bottom to get finished powders packed. In addition, filtered clean air will be emitted from the air outlet of muffler in the end.
Grinding equipments list supplying for 8-10 t/h small size simply - equipped cement clinker grinding.
1.Grinding Mill: Cement Ball mill
2.Feeding Machines: Apron Feeder , Impeller Feeding machine , Magnetic Vibrating Feeding Machine ect.
3.Conveying Equipments: Bucket Elevator, Belt Conveyor, Chain Conveyor , ect.
4.Crushers: Jaw Crusher, Hammer Crusher, Impact Crusher ect .
5.Dust Collectors / Dust Filters: Bag type Dust Collector / dusct filter, Pulse bag Dust Collector, Air box type pulse bag dusct collector ect .
6.High effecient powder separator: High Efficient Horizontal whirling-fluid Powder Separator, Centrifugal powder separator/ concentrator , cyclone powder concentrator ect.
7.Packing Machines: Automatic Cement Packing Machine , 1-12 spouts cement bag rotary packing machine ect .
Introduction of Cement Clinker
The cement clinker uses limestone and clay iron raw materials as the primary raw supplies based on an proper proportion of preparing raw, cooked to some or all the molten, and upon cooling and semi-finished products. Within the cement industry, the most typical silicate cement clinker major chemical composition of calcium oxide, silicon dioxide along with a smaller quantity of aluminum oxide and ferric oxide. Silicate cements clinker with right amount gesso common ground, i.e. Portland cement.
Our service:
Optimum Service of ZK CORP:
We have advanced production technology and management. Our professional engineers and after-sales groups can offer optimum service for our customers.
Pre-sale services
Act as a good adviser and assistant of you; enable you to get rich and generous returns on your investments;
1. Select equipment model; 2. Design and manufacture products according to clients' special requirement; 3. Train technical personnel for clients
Services during the sale
Respect your requirement; devote ourselves to improving the total value of yours.
1. Pre-check products before of delivery; 2. Help you to draft solution.
After-sales service
Provide considerate services to minimize your worries.
1. Assist you to prepare for the first construction scheme; 2. Install and debug the equipment; 3. Train the first-line operators on site; 4. Examine the equipment regularly; 5. Take initiative to eliminate the troubles rapidly at site; 6. Distribute the guarantee fittings door-to-door; 7. Provide perfect service; 8. Provide technical exchanging; 9. Provide maintenance for big items.
Quality assurance
We have got
ISO9001:2008 Quality Management System Certification
CE Certification (Ball Mill)
ISO14001:2004 Environmental Management System Certification
OHSAS 18001:2007 Occupational Health & Safety Management System Certification
Company infromation:
Henan Zhengzhou Mining Machinery Co., Ltd is located in Wulong Industrial Park of Zhengzhou Xingyang which is the capital of Henan Province. It is at the junction of 310 State Road and Xingmi Road, close to the highway, railway station, West Zhongyuan Road, downtown area of Zhengzhou and Zhengzhou International Airport. The transportation condition is very convenient. The main products of company include: ball mill, rotary kiln, vertical preheater, cooler, crusher, metallurgical coke oven, magnetic separator, flotation machine, classifier, feeder, bucket elevator, preheater, dust collector, elevator, drier, and other equipments relate to metallurgy, cement, lime, mineral processing, refractory, chemical industry.