Complete Limestone Processing Plant for Optimal 20-50t/H Output
Contact Supplier
Product Highlights
- High Production Capacity: Output ranges from 100 to 1500 tons per day with capacities of 20t/h to 50t/h.
- Comprehensive After-Sales Service: Includes on-site training, installation guidance, and lifetime maintenance support.
- Experienced Manufacturer: Over 50 years of industry experience with 50 R&D engineers and 322 employees.
- Flexible Payment Terms: Accepts LC, T/T, D/P, PayPal, Western Union, and small-amount payments.
- Low Delivery Cost Strategy: Grinding stations located near cities to minimize raw material and finished product transport fees.
Product Attributes
- Customization
- Available
- After-sales Service
- Provide
- Warranty
- 1 Year
- Model NO.
- Various Model
- Application
- Construction
- Certification
- CE, ISO
- Customized
- Customized
- Automatic Grade
- Semiautomatic
- Installation
- Under Our Engineer's Guide
- Certificate
- ISO900,ISO14000,CE
- Output
- 100-1500tpd
- Experiences
- 50 Years
- Condition
- New
- After Sale Service
- for The Whole Using Life
- Spare Parts
- We Offer
- Testing
- We Offer
- Type
- Cement Clinker Grinding Station
- Training
- on Site
- Transport Package
- Packing in Standard Containers or Meet Your Demand
- Specification
- ISO9001, ISO14000, CE
- Trademark
- zk
- Origin
- Henan, China (Mainland)
Product Images of Complete Limestone Processing Plant for Optimal 20-50t/H Output
Find Similar Products
Product Description
Complete Limestone Grinding Plant Equipment with Capacity 20t/h-50t/h
Cement grinding plant has a separate production unit of cement final product, this phase will add an appropriate amount of cement clinker grinding mixed materials, and output of end cement products. Cement production, the general line can be divided into raw material preparation, clinker and cement made three processes.Silicate cement production technology in cement production representative, is composed of limestone and clay as the main raw material, crushing, batching, grinding into raw material, and then feeding mature cement kilns burning material, and then cooked add appropriate amount of gypsum materials (sometimes mixed with mixed materials or additives) from Ground.

Generally, cement clinker production line is established nearby the raw material site, and the cement grinding station is set up near the big - medium city where the main sale market of the cement is, thus will reduce the delivery fee, if the clinker production station also set up in the city, because one tons clinker need to consume 1.6 tons raw material, which will add 60% raw material delivery cost. Otherwise, if the clinker production line stay together with the clinker grinding station in the raw material site, because the mixed material most are the city slag, these mixed slag will delivered to the raw material site, and final cement will also be delivered to the city, so add much more delivery cost,

So in recent years, Most cement clinker grinding stations are established nearby the city, Cement grinding station is a green-effective industry.
Parameter
| No. | Item | Unit | Closed circuit production | ||||
| 1 | Factory capacity | ×10³t/a | 100 | 160 | 250 | 350 | 500 |
| 2 | Main material usage | ||||||
| Clinker | t/a | 80000 | 128000 | 200000 | 280000 | 400000 | |
| Gypsum | t/a | 5000 | 8000 | 12500 | 17500 | 25000 | |
| Pozzolana | t/a | 15000 | 24000 | 37500 | 52500 | 75000 | |
| 3 | Energy consumption | ||||||
| Fresh water | t/a | 4000 | 7000 | 9000 | 12000 | 17000 | |
| Electrical | kWh/a | 3600000 | 5700000 | 8500000 | 1200000 | 1.7E+07 | |
| 4 | Layout transportation | ||||||
| Land area | 15000 | 18000 | 20000 | 22000 | 24000 | ||
| 5 | Project invest | ||||||
| Production line total invest | Ten | 600 | 1000 | 1500 | 2000 | 2850 | |
| thousand | |||||||
| 6 | Workers | 30 | 35 | 35 | 35 | 35 | |
| 7 | Main equipment | ||||||
| Ball mill | Φ2.2×6.5m | Φ2.4×11m | Φ3×11m | Φ3.2×13m | Φ3.5×13m | ||
| 14t/h | 24t/h | 35t/h | 50t/h | 70t/h | |||
| 380kW | 630kW | 1250kW | 1600kW | 2000kW | |||
| Belt conveyor | B500 | B650 | B650 | B800 | B1000 | ||
| Mill outlet bucket elevator | TH315 | TH400 | NE100 | NE150 | NE200 | ||
| Air classifier | NHX400 | NHX600 | NHX700 | NHX800 | NHX1000 | ||
| (Osepa N250) | (Osepa N500) | (Osepa N750) | (Osepa N1000) | (Osepa N1500) | |||
| Bag filter | PPC32-4 | PPC32-6 | PPC64-5 | PPC64-6 | PPC64-7 | ||
| (PPC64-6) | (PPC96-7) | (PPC96-2×5) | (PPC96-2×6) | (PPC96-2×10) | |||
| Finished production bucket elevator | TH250 | TH315 | NE50 | NE100 | NE100 | ||
| Screw conveyor | LS400 | LS400 | LS500 | - | - | ||
| Packer | Three nozzle | Four nozzle | Six nozzle | Eight nozzle | Eight nozzle | ||
| Belt weigher | B500×2000 | B650×2500 | B800×2500 | B800×2500 | B1000×3500 | ||
Brief introduction of cement grinding station process flow:
After crushed by hammer crusher, the large materials become small ones and are sent to storage hopper by elevator, edge of then evenly sent to the upper distribution plate of the turnplate by vibrating feeder and sloping feeding pipe. When the grinding mill is at work, all the grinding rollers are rolling in the ring, and the materials are driven to the edge of the turnplate by the centrifugal force and fall down into the grinding chambers where the materials are repeatedly pressed, crushed and grinded by the rollers.
The high-pressure air blower constantly inhales air within the grinding mill and, in turn, the air flow with crushed materials are brought to the classifier whose high-speed impeller will screen the airflow: the unqualified particle size will fall and return to the mill for being reground while the qualified particle size mixed with air will go into the cyclone powder collector. Most of the qualified powders will fall an exit from the discharging valve at the bottom; a small proportion of the fine powders, with airflow, moves to the dust cleaner, and clings to the surface of the filter bags.
At the same time, the fine powders clinging to the surface fall down by the sudden vibration of the filter bags, which is caused by the instantly ejected high-pressure gas controlled by the pulse valve.The materials from the above two lots are sent by the conveyor at the bottom to get finished powders packed. In addition, filtered clean air will be emitted from the air outlet of muffler in the end.
Grinding equipments list supplying for 8-10 t/h small size simply - equipped cement clinker grinding.
1.Grinding Mill: Cement Ball mill
2.Feeding Machines: Apron Feeder , Impeller Feeding machine , Magnetic Vibrating Feeding Machine ect.
3.Conveying Equipments: Bucket Elevator, Belt Conveyor, Chain Conveyor , ect.
4.Crushers: Jaw Crusher, Hammer Crusher, Impact Crusher ect .
5.Dust Collectors / Dust Filters: Bag type Dust Collector / dusct filter, Pulse bag Dust Collector, Air box type pulse bag dusct collector ect .
6.High effecient powder separator: High Efficient Horizontal whirling-fluid Powder Separator, Centrifugal powder separator/ concentrator , cyclone powder concentrator ect.
7.Packing Machines: Automatic Cement Packing Machine , 1-12 spouts cement bag rotary packing machine ect . 
Introduction of Cement Clinker
The cement clinker uses limestone and clay iron raw materials as the primary raw supplies based on an proper proportion of preparing raw, cooked to some or all the molten, and upon cooling and semi-finished products. Within the cement industry, the most typical silicate cement clinker major chemical composition of calcium oxide, silicon dioxide along with a smaller quantity of aluminum oxide and ferric oxide. Silicate cements clinker with right amount gesso common ground, i.e. Portland cement.
Our service:
Optimum Service of ZK CORP:
We have advanced production technology and management. Our professional engineers and after-sales groups can offer optimum service for our customers.
Pre-sale services
Act as a good adviser and assistant of you; enable you to get rich and generous returns on your investments;
1. Select equipment model; 2. Design and manufacture products according to clients' special requirement; 3. Train technical personnel for clients
Services during the sale
Respect your requirement; devote ourselves to improving the total value of yours.
1. Pre-check products before of delivery; 2. Help you to draft solution.
After-sales service
Provide considerate services to minimize your worries.
1. Assist you to prepare for the first construction scheme; 2. Install and debug the equipment; 3. Train the first-line operators on site; 4. Examine the equipment regularly; 5. Take initiative to eliminate the troubles rapidly at site; 6. Distribute the guarantee fittings door-to-door; 7. Provide perfect service; 8. Provide technical exchanging; 9. Provide maintenance for big items.
Quality assurance
We have got
ISO9001:2008 Quality Management System Certification
CE Certification (Ball Mill)
ISO14001:2004 Environmental Management System Certification
OHSAS 18001:2007 Occupational Health & Safety Management System Certification
Company infromation:
Henan Zhengzhou Mining Machinery Co., Ltd is located in Wulong Industrial Park of Zhengzhou Xingyang which is the capital of Henan Province. It is at the junction of 310 State Road and Xingmi Road, close to the highway, railway station, West Zhongyuan Road, downtown area of Zhengzhou and Zhengzhou International Airport. The transportation condition is very convenient. The main products of company include: ball mill, rotary kiln, vertical preheater, cooler, crusher, metallurgical coke oven, magnetic separator, flotation machine, classifier, feeder, bucket elevator, preheater, dust collector, elevator, drier, and other equipments relate to metallurgy, cement, lime, mineral processing, refractory, chemical industry.

About the Supplier
This supplier has been audited by BV. Verify the report on the official BV website with ID "MIC-ASR269150". Items marked "" are certified.
Company Profile
Henan Zhengzhou Mining Machinery Co., Ltd, was established in 1956 and located in Xingyang of Zhengzhou City of Henan Province, specially produces metallurgical machinery. It covers an area of more than 55000m2 and various building area of 28000 m2. It has the annual income of more than RMB180million in 2008 and now the fixed assets of over RMB80 million. In the plant, there are branches and workshops of cast iron, cast steel, forging, heavy machine tool processing, rivet welding and heat treatment etc. Its perfect and complete equipment, advanced detection means, strong technical force establish good foundation for the reliable production.
Main products include: Jaw style, hammer style, impact style and roll style crusher; Ball mill, direct fired drier, rotary kiln, preheater, coker, magnetic separator, flotation machine, classifier, feeder, hoisting machine and conveyor etc. These complete sets of machinery for cement building material, metallurgy, coking and chemical smelting etc are sold well in the world. Our company also has professional installation and construction teams and perfect after-sales service guaranty system.
With the development of the People's Republic of China, Henan Zhengzhou Mining Machinery Co., Ltd undergoes frequent difficulties and has accomplished over 50 years' brilliant history. Initially from the manufacturing of original single machine till today's series of and complete sets of mining metallurgical machinery, it has made great contribution to the development and utilization of mineral resources of our country. For many years, each spot check and annual examination carried by National Mining Machinery Quality Supervision and Inspection Center for our products is acceptable and our company is always appointed as Credible and Reputed Enterprise by Henan Provincial Administration of Industry and Commerce.
Henan Zhengzhou Mining Machinery Co., Ltd will continue providing excellent products and service for our society, with the guideline of "survival by quality, development by good faith, users supreme". Our company would make sincere cooperation with all circles for mutual benefit and common development.
About Our Factory & Business Background
-
Business Type
- Manufacturer/Factory & Trading Company
- Address
- 15th Fl, Bldg No. 13, National University Science Park(East), No. 279, West 3# Ring Rd, Zhengzhou, Henan, China
-
Plant Area
- 35348 square meters
-
Number of Employees
- 322
-
Registered Capital
- 31,680,000 RMB
-
Terms of Payment
- LC, T/T, D/P, PayPal, Western Union, Small-amount payment
-
International Commercial Terms(Incoterms)
- FOB, CIF, CFR, EXW
-
Average Lead Time
-
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays, one month -
Nearest Port
- Qingdao Port
-
Minimum Order Quantity
- 1
-
Supply Chain Partners
- 50
Our Production Capability & Technical Expertise
-
Main Products
- Rotary Kiln, Ball Mill, Disc Granulator, Active Lime Production Line, Cement Production Line, Magnesium Calcined Line, Cement Grinding Plant, LECA Production Line, Rotary Dryer, Conveyor, Bag Filter
-
Production Lines
- 10
-
Production Machines
- Heavy-duty machine tools, Laser cutting machine
-
QA/QC inspectors
- 5 people
-
Inspection Type for Finished Products
- 100% inspection(Visual inspection & Function inspection)
-
Inspection Method for Finished Products
- Have instructions and uniformly followed
-
Customization Options
- Customization from Samples, Customization from Designs, Full Customization, Minor Customization, Flexible customization
-
ODM Service Available
- Yes
-
OEM Service Available
- Yes
-
R&D Engineers
- 50 people
-
Traceability of Raw Materials
- Yes
-
Own Brand
- Yes
Our Industry Experience & Global Business Record
-
Year of Establishment
- 2007-03-19
-
Export Year
- 19 years
-
Main Markets
- North America, Europe, Southeast Asia/ Mideast, Africa, Asia
-
Repeat Buyers Choice
- 50%~80%
-
Annual Export Revenue
- 4,131,200 USD
-
Number of Foreign Trading Staff
- 18
-
Overseas Agent/Branch
- No
-
New Products Launched in Last year
- Yes
Our Certifications, Standards & Industry Recognition
-
Management System Certification
- ISO45001:2018, ISO9001:2015, ISO14001
-
Product Certification
- CE
-
Cooperated with Fortune 500
- No
Send your message to this supplier
People who viewed this also viewed
-
US$12,600.00-389,600.00 / Set
-
US$10,000.00-99,999.00 / Piece
-
US$10,000.00-99,999.00 / Piece
-
US$100,000.00-900,000.00 / Piece
-
US$15,000.00-550,000.00 / Piece
-
US$60,000.00-200,000.00 / Set
-
US$13,000.00-280,000.00 / Piece
-
US$20,000.00-500,000.00 / Piece
-
US$200,000.00-1,000,000.00 / Set
-
US$19,000.00-200,000.00 / Piece
Product Categories
Find Similar Products By Category
- Supplier Homepage
- Products
- Cement Making Machine
- Complete Limestone Processing Plant for Optimal 20-50t/H Output
Related Categories
Hot Searches
- China Grinding Factories
- China Plant Factories
- Grinding Equipment Factories
- Plant Equipment Factories
- Grinding Plant
- Grinding Machine Plant
- Grinding Mill Plant
- Industrial Grinding Plant
- Limestone Plant
- Top 10 Grinding
- Complete Plant Bulkbuy