Energy saving mini cement grinding station
Product Description:
Complte steps of cement plant process:
Step 1:Raw materials Preparation--Limestone crushing
a.Process introduction: Limestone is the main raw material in cement production , and most factories are located near the limestone by blasting or use the loader to the mining of raw materials limestone , transported to the crusher into fragments .
b.The main raw material:limestone,clay,iron ore
Step 2:Raw material grinding --Limestone , clay , iron and other raw materials
a.Process introduction: the use of ball mill or vertical mill raw material is ground to a powder, and then by conveyor transport to preblending yard for storage and further material mixed
b.The main raw material:
Step 3:Cement grinding--Clinker , gypsum,mix materials and so on
a.Process introduction: Clinker , gypsum, mixed materials in a ball mill , cement grinding into a qualified drug cement. The use of the powder selecting machine can conveniently adjust cement drug, to achieve energy saving production
b.Main Products:Ball mill, Powder selecting machine ,Bucket elevator, Air chute ,FU chain conveyor, Dust collector etc.
ste p5:Cement storage,packaging--Finished cement belt/bulk delivery
a. Process introduction: The use of packaging machines and automatic loading machine can achieve the shipment of bagged cement factory, use bulk cement equipment can realize bulk cement canning factory
b.Equipment:Conveying equipment, Dust collecting equipment,Belt conveyor,Elevator Air chute,Spiral screwetc.
Cement storage and Cement packing:
Three round silos will be used for cement storage. Feeding cement from cement silo to packing machine, cement packer will be used for cement packing. Cement will be fed into vibration sieve by elevator, then into cement hooper, and then into cement packer. Bagged cement will be sent into loading machine by belt conveyor.
The weight of each bag will be measured and adjusted by electron balance when packing.
Packing system sets has the complete soot eliminating devices to ensure the exhaust standard.
Cement Grinding's working principle:
The cement grinding has horizontal cylindric rotating device, outer rotating with gear, two warehouses, is lattice-type ball mill. Material from the feeder device throuth hollow shaft of feeder evenly into the first warehouse of cement grinding , there are ladder liner and ripple liner in the warehouse , built by steel ball with different specifications , rotating cylinder produces centrifugal force take the ball to a certain height then fall,have a impact of the thumping and grinding for the material. After the material in the first warehouse reach coarse grinding,pass throuth single-wall partition into the second position, the warehouse lined with flat lining and steel balls in it ,have further grinding for the material . Powder discharged through the discharging plate to complete the grinding operation.
Company information:
Henan Zhengzhou Mining Machinery Co., Ltd is located in Wulong Industrial Park of Zhengzhou Xingyang which is the capital of Henan Province. It is at the junction of 310 State Road and Xingmi Road, close to the highway, railway station, West Zhongyuan Road, downtown area of Zhengzhou and Zhengzhou International Airport. The transportation condition is very convenient. The main products of company include: ball mill, rotary kiln, vertical preheater, cooler, crusher, metallurgical coke oven, magnetic separator, flotation machine, classifier, feeder, bucket elevator, preheater, dust collector, elevator, drier, and other equipments relate to metallurgy, cement, lime, mineral processing, refractory, chemical industry. The products of Henan Zhengzhou Mining Machinery Co., Ltd have been sold to every province of China and exported to Russia, Korea, Vietnam, Malaysia, Nepal, Bangladesh, Mexico, Armenia, Africa, South America and other countries and regions.
FAQ:
1. What's the biggest cement plant you can suppy?
3000TPD
2. What's the technology you adopt for the cement plant?
Dry Style with Preheater Technology
3. How many people needed to operate a cement plant?
It's about 100-120 persons