High Efficiency Copper Ore Dressing Line with Factory Price

Product Details
Customization: Available
Application: Ore Dressing
Capacity: Customized
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2011

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
226
Year of Establishment
2007-03-19
  • High Efficiency Copper Ore Dressing Line with Factory Price
  • High Efficiency Copper Ore Dressing Line with Factory Price
  • High Efficiency Copper Ore Dressing Line with Factory Price
  • High Efficiency Copper Ore Dressing Line with Factory Price
  • High Efficiency Copper Ore Dressing Line with Factory Price
Find Similar Products

Basic Info.

Model NO.
Various Model
Certificate
ISO9001,ISO14000
Installation
Guided by Our Engineers
After Sale Service
1 Year Warranty
Output
Can Be Customized
Advantage
Professional Manufacture
Company Established
1956
Experience
More Than 50 Years
Spare Parts
We Offer
Transport Package
Standard Export Packing
Specification
ISO9001, ISO14000, CE
Trademark
ZK
Origin
Zhengzhou, China
Production Capacity
Customized

Product Description

Beneficiation Plant
ZK CORP owns strong ability to offer solution for beneficiation plant and supply benefication equipments. The minerals we can process contain gold, silver, copper, lead & zinc, iron, tungsten, tin, etc.
Craft introduction Beneficiation Method:
According to different mineral characteristics, different beneficiation method is used. There are magnetic beneficiation, flotation beneficiation and gravity beneficiation. Some minerals have many elements suitable for beneficiation, so 2 type beneficiation method will be used in one plant for different elements.

High Efficiency Copper Ore Dressing Line with Factory Price


Beneficiation Plant Description
Beneficiation plant contain crushing system, grinding system, separation system.
A. Crushing System
Introduction:
Minerals are explored from mountain and will firstly need to be crushed and get suitable size for next stage grinding system. Stone size will be changed from 500mm to 25mm.
Equipments: Feeder-Jaw Crusher-Cone Crusher (or Impact crusher or Fine Jaw crusher) -Screen-Belt Conveyor.
Process: Front loader feed mineral ore into hopper and stones will be feed into jaw crusher by feeder. Then material comes to secondary crusher. After crushing, material goes to screen. Material≤ 25mm goes to ball mill. >25mm goes back to secondary crusher to crush again. It forms closed circuit crushing system.
B. Grinding Sytem
Introduction:
After crushing, minerals need to be grinded into micro particle at about 200 mesh to prepare for element separation. Stone size will be changed from 25mm to 200mesh.
Equipments: Ball mill-Classifier(or hydrocyclone)
Process: Material after crushing will be conveyed to ball mill by belt conveyor or bucket elevator. In ball mill, material will be grinded and discharged to classifier for grading. Suitable material will go to next stage, big material will go back to ball mill to grind again. It forms a closed circuit grinding system.
C. Separation System
Element separation have 3 method: Magnetic beneficiation, Flotation beneficiation and Gravity beneficiation. Different mineral type will use different beneficiation method accroding to minerial's characteristics.
Magnetic beneficiation is suitable for iron ore. Flotation beneficiation is suitable for gold, silver, copper. Gravity is suitalbe for gold, tungsten, tin, etc.
Equipments: Magnetic beneficiation. Main equipments contain magnetic separator.
Flotation beneficiation. Main equipments contains flotation, mixing tank, concentrator.
Gravity beneficiation: Sprial chute, shaking table, jigger.
Process: After grinding, suitable material size for beneficiation is achieved. For iron, material will goes to magnetic separator. For gold and copper, material will go to flotation.
For some plant, 2 beneficiation method are all used. After magnetic or flotation separation, mateiral will go to sprial chute and shaking table to separate different elements.

High Efficiency Copper Ore Dressing Line with Factory Price



 
spec technical parametere speed reducer motor supporting quantity
(m) rev slope output type type power
  (r/min) (%) (t/h) (KW)
Φ1.6x32 0.58~2.85 4 2 ZQ75-50 YCT250-4A 18.5 3
Φ1.6/1.9x36 0.53~1.59 4 2.5~3 ZQ110-7 YCT250-4B 22 3
Φ1.9x39 0.53~1.59 4 3~3.4 ZQ125-7 YCT315-4A 37 3
Φ2.2x45 0.214~1.64 3.5 4~5 main:ZS125-5 YCT315-4B 45 3
auxiliary:ZQ40-40 Y112M-4 4
Φ2.5x50 0.62~1.5 3.5 5~6 main:ZS165-5 YCT355-4A 55 3
auxiliary:ZS50-1 Y160M-6 7.5
Φ2.5x55 0.62~1.5 3.5 5~6 main:ZS165-5 YCT355-4A 55 3
auxiliary:ZS50-1 Y160M-6 7.5
Φ2.8x55 0.62~1.5 3.5 6~7 main:ZS165-6 YCT355-4B 75 3
auxiliary:ZS50-1 Y160L-6 11
Φ3.0x60 0.5~1.5 3.5 7~9 main:ZS165-3 ZSN-280-11B 125 4
auxiliary:ZS50-1 Y160L-6 11
Φ3.2x64 0.4~1.5 3.5 8~10 main:ZL130-16 ZSN-280-11B 190 4
auxiliary:ZL50-10 Y180L-4 22
Φ3.5x70 0.4~1.5 3.5 12~14 main:ZSY500-40 ZSN-315-082 280 4
auxiliary:ZL50-14 Y180L-4 22
Φ4x80 0.4~1.5 3.5 16~20 main:ZSY630-35.5 ZSN-315-12 355 4
auxiliary:ZSY280-35.5 Y200L-4 30


High Efficiency Copper Ore Dressing Line with Factory Price
High Efficiency Copper Ore Dressing Line with Factory Price
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier